Bearing Service Exchange
Reduce your stock holding, and minimise downtime with our bearing service exchange program.

Exchange an old bearing assembly for a new or refurbished one at just 60% of the price of buying new.
Even before that hot, noisy, or high vibration bearing assembly fails, you can have a service exchange unit shipped to site, ready to install, minimizing downtime without increasing your stock holding. We can provide you with a new or remanufactured unit in a short period of time, typically dispatched the same day.
From this:



To this:


Exchange process
- Contact us and have the bearing assembly size ready to tell us.
- We’ll check our inventory and provide you an estimated arrival date of a new/remanufactured unit with detailed pricing.
- Place an order to hire a service exchange bearing assembly on a per day basis.
- We’ll provide freight instructions so you can ship the damaged unit back to our workshop.
- When we receive your damaged assembly, place an order for the service exchange unit (60% of the ‘new’ bearing assembly price). The service exchange hire unit is then yours.
- Depending on the condition of the returned housing, it will either be scrapped or be overhauled, going into our pool of remanufactured units, awaiting the next emergency call.
- Every bearing assembly is meticulously checked, to ensure compliance with acceptable tolerances, is run tested, with reports, and provided with the same warranty as a new bearing assembly. You can rest assured each overhauled assembly will perform as new.
Features & benefits
- Less risk in critical rotating component of pump due to optimal assembly under ideal workshop conditions
- Less waste and environmental damage as parts are used where they still comply with as new tolerances
- Less components to stock in store inventory
- Fully test run to ensure reliability with guarantee
- Maximise uptime due to short waiting period for component
- New design features available to combat corrosion and bearing failure
- Interchangeable components with existing design of pumps
- Best practise bearings, grease and seals to ensure maximum life
- Overhaul is done without time constraint compromises
- Report on condition of components and replacements undertaken

Typical Service Exchange includes
- Complete Strip Down
- Bead Blast/Clean
- New Bearings
- New O Rings
- New Shims
- New Fasteners
- Reassemble
- Run Test
- Two Pack Epoxy Coating
- Service Tag ID
- Test Certificate
- Laminated BOM sheets and SA Drawings
- Electronic (PDF) IOM Manuals
- Refer Section 3 of the 7D catalogue for all individual parts prices that will be used when overhauling units.
- Freight to and from site is by others.